CS350 Steel Crawler Water Well Drilling Equipment for Testing Well

Product Details
Customization: Available
After-sales Service: 1 Year
Warranty: 1 Year
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Diamond Member Since 2021

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

In-stock Capacity
The supplier has In-stock capacity
Fast Delivery
The supplier can deliver the goods within 30 days
R&D Capabilities
The supplier has 5 R&D engineers, you can check the Audit Report for more information
Product Certification
The supplier's products already have relevant certification qualifications, including:
CE
to see all verified strength labels (19)
  • CS350 Steel Crawler Water Well Drilling Equipment for Testing Well
  • CS350 Steel Crawler Water Well Drilling Equipment for Testing Well
  • CS350 Steel Crawler Water Well Drilling Equipment for Testing Well
  • CS350 Steel Crawler Water Well Drilling Equipment for Testing Well
  • CS350 Steel Crawler Water Well Drilling Equipment for Testing Well
  • CS350 Steel Crawler Water Well Drilling Equipment for Testing Well
Find Similar Products
  • Overview
  • Product Description
  • Packaging & Shipping
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
CS350
Certification
CE
Condition
New
Motor
DC Motor
Drill Hole Diameter
140-325mm
Drill Hole Depth
<350mm
Bit Type
Cone Bit
Drilling Way
Impactor
Type
Crawler
Power Type
Diesel
Weight
8000 Kg
Applicable Industries
Farms, Construction Works , Energy & Mining, Water
Machinery Test Report
Provided
Key Selling Points
Flexible Manufacturing
Using Air Pressure
1.7-3.4 MPa
Swing Torque
8000 N.M
One-Time Advance Length
6.6m
Engine
91kw
Drill Pipe Diameter
76 89 102 mm
One-Time Advance Length(M)
6.6
Transport Package
Container
Specification
4000*2800*6800mm
Trademark
CS Drill
Origin
Shandong, China
HS Code
8207
Production Capacity
5000

Packaging & Delivery

Package Size
400.00cm * 280.00cm * 680.00cm
Package Gross Weight
8000.000kg

Product Description

 

Product Description

CS350 Steel Crawler Water Well Drilling Equipment for Testing Well

Product Introduction

1. Adopt Yuchai 91kw engine, which provides sufficient power and high driling efficiency.
2. The hydraulic oil pump is a parallel gearbox design, and the oil pump is separated to provide sufficient and reasonablepower distribution.
3. The power head box is integrated, and the dual motors provide greater power and torque, more durable, and lowelmaintenance costs.
4. The driling rig chassis adopts steel crawlers, which has strong environmental adaptability and can cope with morecomplex roads.
5. it adopts a composite boom, which is small in size but long in stroke, double cylinder lifting, and large lifting tonnage
6. Each hydraulic oil pipe is covered with a thickened protective sleeve to extend the service life of the oil pipe
7. Dual systems can be added: 1. Air power system with air compressor 2. Mud pump system with mud pump.


Remark: This drilling rig needs to be used with an air compressor. If you want to buy an air compressor at the same time, Please tell us your drilling depth and diameter. And we will give the corresponding recommendation. We can also put the drilling rig on a truck mounted chassis. Our engineers will help you get what you want.

CS-350 SPECIFICATION PARAMETER
 
Model/Item Unit CS350
Weight T 8.0
The Hole Diameter mm 105-400
Drilling Depth m 350
One-time Advance Length m 6.6
Walking Speed km/h 2-3
Gradeability ° 25
Equipped Capacitor kw 91
Working Air Pressure Mpa 1.7-3.4
Air Consumption m³/min 17-36
Swing Speed rpm 40-160
High Leg Stroke m /
Drill Pipe Diameter mm Φ76 Φ89 Φ102
Drill Pipe Length m 1.5 2.0 3.0 6.0
Rig Lifting Force kn 260
Rapid Rise Speed m/min 20
Fast Feeding Speed m/min 35
Width of Loading m /
Hoisting Force of Winch kn 15
Max. Swing Torque N.m 8000
Dimensions mm 4000*2800*6800
The Penetration Effciency m/h 12-40
The Engine Brand / Yuchai


CS350 Steel Crawler Water Well Drilling Equipment for Testing Well

CS350 Steel Crawler Water Well Drilling Equipment for Testing Well

 

Note:The pneumatic drilling rig is multifunction, with different configurations suitable for different geologies. We can accept customization. If you have any good ideas, please contact us. Our engineers will help you get what you want.

 

Packaging & Shipping

 

CS350 Steel Crawler Water Well Drilling Equipment for Testing Well
CS350 Steel Crawler Water Well Drilling Equipment for Testing Well
CS350 Steel Crawler Water Well Drilling Equipment for Testing Well
CS350 Steel Crawler Water Well Drilling Equipment for Testing Well

Company Profile

CS350 Steel Crawler Water Well Drilling Equipment for Testing WellCS350 Steel Crawler Water Well Drilling Equipment for Testing WellCS350 Steel Crawler Water Well Drilling Equipment for Testing WellCS350 Steel Crawler Water Well Drilling Equipment for Testing Well

FAQ

1. Are you exact manufacturer or just trading company?
We are both, we have our own factory. And also have many long-relationship factories.

2.What is your minimum order quantity?
Our MOQ are 1pc or 1 complete set, the price may rely on the order quantity. We are welcome your sample order to testing our quality.

3. Can you accept OEM & ODM?
Yes, both of them are acceptable,.Please tell us your requirements or design drawings kindly.
As we have our own R&D team and the team leader is Dr.Zhao mingchun who has been always
in the material research and drawing design of drilling tools for 25 years. And he had designed
the world's biggest top hammer bit and DTH hammer bit, highly praised by the users.

4. How about the delivery time?
It depends, generally it takes about 15-25. If have stocks, Usually only 5-10 days if in stock.

5. Can I have a visit to your factory before the order?
Sure, welcome, kindly contact us for address details and time schedule.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now